A while back, I had requested the “Place Option Order” in AUTOMATION to include a feature where we choose ITM6, ITM7, or any strike with an added condition that the strike chosen should be a multiple of 100. In this way even though I choose, say ITM6 Call, Nifty is at 24155, the strike chosen without this feature would be 23850CE. But with this feature added, the chosen strike would be 23900 (Closest 100* multiple to ITM6 Call). That would be a great help in Automation.
Heyy @109559724383761785657, your feedback is duly noted on this.